There was lots more progress on the kitchen this past week in preparation for the cabinets which are meant to be delivered to the warehouse next week (March 10th to be exact). In addition Leslie and I (and three relatively patient little kids) spent consider hours shopping for new appliances. We have nearly decided. Who knew there were so many different options.
The new heating and cooling unit was installed in the attic and new vents were installed in the ceiling of each of the upstairs rooms. The upstairs of the house is now being heated by the new unit. The old floor vents have been disconnected from the downstairs unit.
The remaining windows were installed in our master bedroom and the trim around all the bedroom windows was also installed.
Saturday, March 8, 2008