The new stove arrived this week and was installed on Tuesday. Now we have an operational kitchen again. The ceiling fans were also installed in the new room and our new dining table arrived on Friday.
Next week the tile backsplash in the kitchen will be installed and the carpet for the basement may also get installed.
The new stove
The ceiling fans
The new dining table
Saturday, April 26, 2008
Sunday, April 20, 2008
The Flooring is In
The new bamboo flooring was installed this week in the whole downstairs of the house except for the old living room. They also installed the dishwasher and refrigerator. They installed most of the lighting in the kitchen and eating area - some of our lights are still on order and some we have yet to order. They also installed a custom made retaining wall around the double windows in the back of the basement.
Next week the stove will be installed and our kitchen will be fully operational again. They will be working on the molding around the edges of the floor. Our new table and chairs are also meant to be delivered late next week.
The new retaining wall around the basement windows in the back of the house.
The installation of the floor in progress
The installation of the floor in progress
The dishwasher getting ready to be installed
The installation of the floor in progress
The new floors (and the new refrigerator). They installed a paper path on the main walkway to prevent the constant foot traffic from our dirt backyard from damaging the new floors.
The new floors in the eating area.
The new floors in the kitchen
New floors in the new room
The new dishwasher is now installed.
Next week the stove will be installed and our kitchen will be fully operational again. They will be working on the molding around the edges of the floor. Our new table and chairs are also meant to be delivered late next week.
The new retaining wall around the basement windows in the back of the house.
The installation of the floor in progress
The installation of the floor in progress
The dishwasher getting ready to be installed
The installation of the floor in progress
The new floors (and the new refrigerator). They installed a paper path on the main walkway to prevent the constant foot traffic from our dirt backyard from damaging the new floors.
The new floors in the eating area.
The new floors in the kitchen
New floors in the new room
The new dishwasher is now installed.
Sunday, April 13, 2008
The Counters are Installed
Hello Vandy Construction Blog faithful. Another week has passed and we are hopefully closer to getting a working kitchen again. Things are starting to take shape and you can now finally get a good feel for how everything looks.
The counters were delivered and installed this week and the kitchen is really starting to come together. They also painted the kitchen, the fireplace room, and the new room. The siding is nearly complete. They ran out of siding and needed to order more (that takes about a week to come in) so all but one side of the house is complete. The shutters are not on the house yet, but the new siding looks very good.
Next week they plan to install the new flooring in the kitchen, fireplace room, and the new room. They also plan to install the lighting fixtures (if Leslie and I can find ones we like). Enjoy the pictures!
Wide angle shot of the new counter tops in the kitchen.
You can see the new sink and faucet on the left side and the new bar area on the right side of the picture below.
The desk area
This is the living room wall - you can see our new microwave as well
The new siding on the house
A picture while they were putting it up
The new room is a blue color (I have no idea what the official name of the color is)
The new color of the fireplace room and kitchen. I think its meant to be tan in color, but it looks greenish to me. I think this color is called canvas sneaker (whatever that means).
The counters were delivered and installed this week and the kitchen is really starting to come together. They also painted the kitchen, the fireplace room, and the new room. The siding is nearly complete. They ran out of siding and needed to order more (that takes about a week to come in) so all but one side of the house is complete. The shutters are not on the house yet, but the new siding looks very good.
Next week they plan to install the new flooring in the kitchen, fireplace room, and the new room. They also plan to install the lighting fixtures (if Leslie and I can find ones we like). Enjoy the pictures!
Wide angle shot of the new counter tops in the kitchen.
You can see the new sink and faucet on the left side and the new bar area on the right side of the picture below.
The desk area
This is the living room wall - you can see our new microwave as well
The new siding on the house
A picture while they were putting it up
The new room is a blue color (I have no idea what the official name of the color is)
The new color of the fireplace room and kitchen. I think its meant to be tan in color, but it looks greenish to me. I think this color is called canvas sneaker (whatever that means).
Saturday, April 5, 2008
Basement Is Painted
This week the basement was painted, the molding on the kitchen cabinets was completed, the siding was removed from the house, they started putting on the new siding, and they finished the fireplace surround.
The counter top people came this week to and measured for the counter. They will deliver and install the counter next week. The flooring for the kitchen and new room was also ordered and will be delivered next week.
The new lime green basement.
The newly painted stairway to the basement. A new step was installed at the bottom of the stairs and the half wall on the side of the stairs was cut back to make a landing at the bottom of the basement stairs.
The siding was removed on most of the house
They started to put the new siding on the back of the house. This work will continue next week.
More pictures of the new siding
The molding was installed above the new cabinets and the walls in the kitchen and new room were primed for painting
They also painted the sliding doors between the kitchen and the living room.
The fireplace surround was also completed this past week.
The counter top people came this week to and measured for the counter. They will deliver and install the counter next week. The flooring for the kitchen and new room was also ordered and will be delivered next week.
The new lime green basement.
The newly painted stairway to the basement. A new step was installed at the bottom of the stairs and the half wall on the side of the stairs was cut back to make a landing at the bottom of the basement stairs.
The siding was removed on most of the house
They started to put the new siding on the back of the house. This work will continue next week.
More pictures of the new siding
The molding was installed above the new cabinets and the walls in the kitchen and new room were primed for painting
They also painted the sliding doors between the kitchen and the living room.
The fireplace surround was also completed this past week.
Saturday, March 29, 2008
Kitchen Cabinets are In
Last week they installed the kitchen cabinets painted the master bedroom and started to build the fireplace surround. The old siding is coming off the house right now, so next week you may get to see pictures of the new siding. Now that the cabinets are installed, the counter top guy is coming on Monday to measure for the new counter top.
Our master bedroom is now green.
The main wall of cabinets - looking towards the front of the house - the desk area is at the left side of the picture
Main wall of cabinets - looking towards the back of the house
Saturday, March 22, 2008
The Kitchen Walls are Up
The sheetrock was put up in the kitchen last week and the spackling started. They also completed the other half wall/book case between the fireplace room and the new room. The new siding arrived and so did the new kitchen cabinets.
The new siding is now in the backyard. They may start to put this on the house next week.
Our garage is full of the new kitchen cabinets. They expect to install them next week after they finish spackling the sheet rock in the kitchen
The kitchen now has walls
A new sliding pocket door was installed between the kitchen and the living room
The new siding is now in the backyard. They may start to put this on the house next week.
Our garage is full of the new kitchen cabinets. They expect to install them next week after they finish spackling the sheet rock in the kitchen
The kitchen now has walls
A new sliding pocket door was installed between the kitchen and the living room
Sunday, March 16, 2008
The Temporary Wall is Down
This past week saw the removal of the temporary wall. Now we can really start to see how the new room will fit in with the existing house. They also continued work on the kitchen - finishing the wiring, lighting and miscellaneous framing. The insulation is back in the exterior walls of the kitchen and the sheet rock will be added next week.
Our cabinets are also meant to arrive next week so once the sheet rock is complete the hanging of the cabinets will commence. Here are some updated pictures:
Standing by the fireplace looking towards the front of the house:
Standing by the new bay window in front of the house looking through the kitchen to the new room:
In the following picture you can see the half wall on the right side that will separate the fireplace room from the new room. A similar half wall will be built on the left side
Standing in the new room looking back towards the dining area. Here you can see the other side of the half wall:
A closer picture of the half wall and the column with some ideas on molding around the column for us to think about over the weekend:
Our cabinets are also meant to arrive next week so once the sheet rock is complete the hanging of the cabinets will commence. Here are some updated pictures:
Standing by the fireplace looking towards the front of the house:
Standing by the new bay window in front of the house looking through the kitchen to the new room:
In the following picture you can see the half wall on the right side that will separate the fireplace room from the new room. A similar half wall will be built on the left side
Standing in the new room looking back towards the dining area. Here you can see the other side of the half wall:
A closer picture of the half wall and the column with some ideas on molding around the column for us to think about over the weekend:
A closer picture of the book case on the half wall: