Monday, December 13, 2010

Walls Continue

They have made some good progress on the walls










Friday, December 10, 2010

Week 1 is Complete

Leslie made the workers cookies and coffee today so they were too busy relaxing to make too much progress.


The block veneer on the walls is just getting started

Doing some work to regrade the side of the addition so that it slopes away from the house

Patio from another angle


Close up shot of the block veneer on the wall


Edge of the patio being put into place


Step being built


Step from the main patio to the fire pit area

Thursday, December 9, 2010

More Work on the Blocks

Cutting the blocks for the edge of the patio


Step forming by the entrance to the addition


Location of the firepit (which will eventually be round) can be seen in the patio


Another picture of the firepit area


Wednesday, December 8, 2010

Blocks Being Laid Down

Significant activities happened today. They seem to be able to make a lot of progress in one day. I assume that some of the edging might take longer than the main area.

I am anxious to see the patio again during daylight hours, but that will probably not happen till the weekend.

Special materials spread out that the blocks will rest on


Walls getting more defined


Blocks being put in place







Close up shot for those that enjoy extra details

Ryan trying to get face time on the blog


Ryan and Tyler both trying to get in on the action

Tuesday, December 7, 2010

Foundation is in Place and Walls are Started

Despite the recently cold temperatures, lots of progress has been made on the patio. They have laid the foundation material and started to build the walls. The block has arrived and they plan to start laying that on Wednesday.

The foundation materials have been laid:









Blocks arriving:





Wall starting to be built

Wall by the firepit area

Step between the main patio and the firepit area






Sunday, December 5, 2010

Patio work has started

We have signed a contract to get a new patio (and do some other sundry stuff in the backyard). Work commenced last week with the removal of 3 large pine trees on the side of the house and a large locust tree from the back of the property as well. We are using techo bloc for the patio. There will be a main section outside the addition and then a smaller section with a fire pit behind the addition. There will also be two walls (one in each section of the patio). The fire pit area will be lower than the main area - requiring a step down into that section.

Tyler up in the Locust tree we took down. Leslie was not happy I was taking a picture of this. He is 15-20 feet in the air and there are no branches between him and the ground. He was higher in the tree when Leslie found him in it and called me to come get him down.
Before picture
Another before picture

One of the big pine trees coming down

Another big pine tree coming down

The side of the house without the three big pine trees. Its looks pretty bare at the moment.
Taking out the grass to form the shape of the patio
The outline of the other patio section

With the grass removed they used spray paint to indicate where the walls will be built. Is around the outside of the dirt area - a little hard to see

Spray paint marking where the new step will be built out of the addition
The second part of the patio - a step down into this section and a fire pit in the middle